The project involved the construction of an 800 linear foot wall at the toe of an existing slope parallel to the OCTA trackway.  Constructed of structural grade beams and tiebacks, the wall will provide emergency stabilization for the trackway.

Scope of Services:

  • Provided Construction, Transportation Infrastructure, and Geotechnical/Environmental Monitoring

  • Measuring for Deformation, Ground Movement, Settlement/Displacement, Slope Stability, and Strain

  • Utilizing in-place inclinometers and load cells

  • Monitoring the existing hillside adjacent to the railway and the performance of the new shoring wall.

  • Services included System Planning, System Commissioning, Monitoring Support, Reporting

Quantity:
Add To Cart

The project involved the construction of an 800 linear foot wall at the toe of an existing slope parallel to the OCTA trackway.  Constructed of structural grade beams and tiebacks, the wall will provide emergency stabilization for the trackway.

Scope of Services:

  • Provided Construction, Transportation Infrastructure, and Geotechnical/Environmental Monitoring

  • Measuring for Deformation, Ground Movement, Settlement/Displacement, Slope Stability, and Strain

  • Utilizing in-place inclinometers and load cells

  • Monitoring the existing hillside adjacent to the railway and the performance of the new shoring wall.

  • Services included System Planning, System Commissioning, Monitoring Support, Reporting

The project involved the construction of an 800 linear foot wall at the toe of an existing slope parallel to the OCTA trackway.  Constructed of structural grade beams and tiebacks, the wall will provide emergency stabilization for the trackway.

Scope of Services:

  • Provided Construction, Transportation Infrastructure, and Geotechnical/Environmental Monitoring

  • Measuring for Deformation, Ground Movement, Settlement/Displacement, Slope Stability, and Strain

  • Utilizing in-place inclinometers and load cells

  • Monitoring the existing hillside adjacent to the railway and the performance of the new shoring wall.

  • Services included System Planning, System Commissioning, Monitoring Support, Reporting